Crane Slewing Bearing Replacement – MV Golden Star
Specialized heavy marine crane servicing: crane house lifting and separation, hydraulic torque wrench loosening of slewing ring bolts, dial-gauge adapter flatness metrology, and slewing bearing replacement (executed on MV Golden Star).
The crane slewing bearing supports massive axial, radial, and overturning moment loads during cargo operations. Once raceway wear or rocking-test clearances exceed classification limits, replacing the slewing ring is mandatory for safe cargo handling and Class compliance.
Onboard MV Golden Star, ANSAC executed the complete heavy mechanical scope—from crane house separation and seized-bolt extraction to 360-degree adapter flange flatness metrology and precision bearing installation.
Slewing Bearing Replacement Procedure
Securing the crane jib, rigging heavy-duty lifting gear, and safely separating the crane housing from the pedestal.
Loosening high-tensile slewing ring bolts using hydraulic torque wrenches and safely cutting/extracting corroded seized bolts.
Cleaning the pedestal top plate and setting up a rotating sweep arm with a dial indicator to verify adapter flange flatness across 360°.
Positioning the new slewing bearing per soft-zone markings, cross-torquing bolts to OEM specifications via hydraulic wrench, greasing, and conducting slewing/load tests.
Strict control of adapter flange flatness and calibrated hydraulic bolt tensioning ensures maximum service life and operational crane safety.
MV Golden Star Crane Slewing Bearing Replacement Gallery
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 1
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 2
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 3
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 4
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 5
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 6
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 7
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 8
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 9
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 10
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 11
Cutting and extracting seized high-tensile bolts on the crane pedestal
Adapter flange flatness inspection and verification results
Setting up dial-gauge sweep fixture to check adapter flange flatness
Measuring 360-degree adapter flange flatness with precision dial indicator
Loosening slewing ring bolts with hydraulic torque wrench
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 17
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 18
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 19
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 20
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 21
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 22
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 23
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 24
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 25
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 26
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 27
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 28
Crane Slewing Bearing Replacement – MV Golden Star – Field work photo 29